{"id":4548,"date":"2025-05-14T08:10:01","date_gmt":"2025-05-14T08:10:01","guid":{"rendered":"https:\/\/www.tironi.com\/?p=4548"},"modified":"2025-05-15T06:51:44","modified_gmt":"2025-05-15T06:51:44","slug":"connection-to-the-grid-of-the-new-830-kwp-photovoltaic-plant","status":"publish","type":"post","link":"https:\/\/www.tironi.com\/en\/news-en\/connection-to-the-grid-of-the-new-830-kwp-photovoltaic-plant\/","title":{"rendered":"\ud83d\udd0c Connection to the Grid of the new 830 kWp Photovoltaic Plant!"},"content":{"rendered":"<p>We are pleased to announce that today our new 830 kWp photovoltaic plant, installed on the roof of our facility, has been officially connected to the power grid.<\/p>\n<p>The system, consisting of over 1,730 next-generation photovoltaic modules, covers an area of nearly 4,000 m\u00b2 and is expected to generate more than 960,000 kWh annually, significantly contributing to the company\u2019s energy self-consumption.<\/p>\n<p>Thanks to this production, we estimate a reduction in CO\u2082 emissions of approximately 560 tons per year\u2014 a tangible environmental impact and an important step toward an increasingly sustainable and efficient production model.<\/p>\n<p>This project represents a strategic ESG-oriented investment and strengthens our long-term commitment to responsible innovation and energy transition.<\/p>\n<p>Special thanks to Crea Energia, all technical partners, and our internal team who made this achievement possible, from design to activation.<\/p>\n<p>We continue to look to the future, with the right energy.<\/p>\n<p>#Sustainability #CleanEnergy #Photovoltaics #GreenEnergy #ESG #EnergyTransition #Innovation #SolarPlant #ZeroEmissions<\/p>\n<p><img decoding=\"async\" src=\"https:\/\/www.tironi.com\/wp-content\/uploads\/2025\/05\/Loghi_CoesioneITA_UE_REP_ER_21-27_compatta_colore-300x58.jpg\" alt=\"\" width=\"300\" height=\"58\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>We are pleased to announce that today our new 830 kWp photovoltaic plant, installed on the roof of our facility, has been officially connected to the power grid.<\/p>\n","protected":false},"author":3,"featured_media":4530,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[23],"tags":[],"class_list":["post-4548","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news-en"],"_links":{"self":[{"href":"https:\/\/www.tironi.com\/en\/wp-json\/wp\/v2\/posts\/4548","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.tironi.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.tironi.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.tironi.com\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.tironi.com\/en\/wp-json\/wp\/v2\/comments?post=4548"}],"version-history":[{"count":1,"href":"https:\/\/www.tironi.com\/en\/wp-json\/wp\/v2\/posts\/4548\/revisions"}],"predecessor-version":[{"id":4549,"href":"https:\/\/www.tironi.com\/en\/wp-json\/wp\/v2\/posts\/4548\/revisions\/4549"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.tironi.com\/en\/wp-json\/wp\/v2\/media\/4530"}],"wp:attachment":[{"href":"https:\/\/www.tironi.com\/en\/wp-json\/wp\/v2\/media?parent=4548"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.tironi.com\/en\/wp-json\/wp\/v2\/categories?post=4548"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.tironi.com\/en\/wp-json\/wp\/v2\/tags?post=4548"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}