{"id":4557,"date":"2025-05-30T12:03:45","date_gmt":"2025-05-30T12:03:45","guid":{"rendered":"https:\/\/www.tironi.com\/?p=4557"},"modified":"2025-05-30T12:08:20","modified_gmt":"2025-05-30T12:08:20","slug":"elettromeccanica-tironi-inaugurates-new-logistics-facility-in-modena","status":"publish","type":"post","link":"https:\/\/www.tironi.com\/en\/news-en\/elettromeccanica-tironi-inaugurates-new-logistics-facility-in-modena\/","title":{"rendered":"Elettromeccanica Tironi inaugurates new logistics facility in Modena"},"content":{"rendered":"<p>A major milestone for <strong>Elettromeccanica Tironi<\/strong>, which has inaugurated a <strong>new 3,000 sqm logistics facility<\/strong>, a modern and advanced structure dedicated to the <strong>storage and handling of key components for power plant transformers<\/strong>.<\/p>\n<p>Located in <strong>Modena<\/strong>, less than <strong>1.5 km from the company\u2019s historic headquarters in Via Emilia Est<\/strong>, the new logistics hub is a <strong>strategic investment<\/strong> aimed at <strong>optimizing operations<\/strong>, enhancing logistics efficiency, and actively contributing to the <strong>energy transition<\/strong>.<\/p>\n<p>The ribbon-cutting ceremony was led by company President <strong>Maurizio Tironi<\/strong>, joined by his sons <strong>Matteo and Marco<\/strong>, marking the continuity of the future vision.<\/p>\n<p>This new facility is part of the company\u2019s long-term strategy to provide <strong>energy for the future<\/strong>, through cutting-edge infrastructure and a strong connection to the Modena region.<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignnone size-medium wp-image-4563\" src=\"https:\/\/www.tironi.com\/wp-content\/uploads\/2025\/05\/PERI3-Rid-300x225.jpg\" alt=\"\" width=\"300\" height=\"225\" srcset=\"https:\/\/www.tironi.com\/wp-content\/uploads\/2025\/05\/PERI3-Rid-300x225.jpg 300w, https:\/\/www.tironi.com\/wp-content\/uploads\/2025\/05\/PERI3-Rid-768x576.jpg 768w, https:\/\/www.tironi.com\/wp-content\/uploads\/2025\/05\/PERI3-Rid.jpg 1024w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>A major milestone for Elettromeccanica Tironi, which has inaugurated a new 3,000 sqm logistics facility, a modern and advanced structure dedicated to the storage and handling of key components for power plant transformers.<\/p>\n","protected":false},"author":3,"featured_media":4554,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[23],"tags":[],"class_list":["post-4557","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news-en"],"_links":{"self":[{"href":"https:\/\/www.tironi.com\/en\/wp-json\/wp\/v2\/posts\/4557","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.tironi.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.tironi.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.tironi.com\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.tironi.com\/en\/wp-json\/wp\/v2\/comments?post=4557"}],"version-history":[{"count":4,"href":"https:\/\/www.tironi.com\/en\/wp-json\/wp\/v2\/posts\/4557\/revisions"}],"predecessor-version":[{"id":4565,"href":"https:\/\/www.tironi.com\/en\/wp-json\/wp\/v2\/posts\/4557\/revisions\/4565"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.tironi.com\/en\/wp-json\/wp\/v2\/media\/4554"}],"wp:attachment":[{"href":"https:\/\/www.tironi.com\/en\/wp-json\/wp\/v2\/media?parent=4557"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.tironi.com\/en\/wp-json\/wp\/v2\/categories?post=4557"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.tironi.com\/en\/wp-json\/wp\/v2\/tags?post=4557"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}